Two weeks of relentless rain in the Patagonian steppe. The ground is a mess, and the pace has slowed down, but the work hasn't stopped.
I've been working outside between downpours, getting the steel stirrups ready for the next structural phase. Get your name on the wall before the next clear day: http://patagoniabrick.com